摘要
尼尔基水利枢纽是嫩江干流上第一座控制性的大型水利工程。本文介绍了尼尔基工程主坝与左副坝的连接段、主坝与厂房坝段的连接段、右副坝与厂房的连接段、右副坝与溢洪道两侧的连接段的连接形式,并阐述5处连接段的设计比较分析过程。
Nierji water complex is the first dominant big hydro project in the main stream of Nenjiang river.The paper introduces the connecting mode of main dam and left auxiliary dam,main dam and building dam block,right auxiliary dam and building dam block,right auxiliary dam and spillway dam block,introduces the design and the comparison of five connecting blocks.
出处
《东北水利水电》
2004年第2期9-10,共2页
Water Resources & Hydropower of Northeast China
关键词
主坝
副坝
连接段
尼尔基
main dam
auxiliary dam
connecting block
Nierji water complex