摘要
亭子坳水电站为二级开发,由于两级电站布置非常紧凑,两座厂房水平距离不足70m,因此,对2个电站电气主接线方案进行了综合分析,选择较优方案.
This paper comprehensively analyzed the electric main wire plans between Tinziao hydropower station and its power station in upcascade.At last,the optimum plan was selected.
出处
《江西水利科技》
2003年第3期180-181,185,共3页
Jiangxi Hydraulic Science & Technology