摘要
经过对新型污水净化器的调研,确认该装置净化污水能力较差的主要原因是内部结构存在较多缺陷所致,改造冲洗器、排污器、冲洗泵、滤网托架、锥型反应器和滤帽后,污水净化后的浊度降至12~19mg/L,达到了设计能力。
By investigation and research on the new type sewage purifier, it is confirmed that the main factors that make treatment capacity less than design capacity are resulted from many internal defects. After modifying the washer, drainage washing pump, filter frame, pyramidal reactor and filter cap, the turbidity of the purified water can be descended to 12 ~ 19 mg/L. Its capacity can reach the design capacity.
出处
《工业水处理》
CAS
CSCD
2004年第2期70-71,共2页
Industrial Water Treatment