摘要
A slope engineering system is a complex system, in which many uncertaintiesexist, including random uncertainties and fuzzy uncertainties. Traditionally, random uncertaintieswere often considered, while fuzzy uncertainties were ignored. Therefore, fuzzy-random methodsshould he proposed. A fuzzy point estimate method was proposed by Dodagoudar, that is, consideringthe effect of fuzzy-random factors, the fuzzy-random limit state function of slopes is changed torandom interval limit state function by the lambda level cutting, then the moments of the functioncan be obtained by the Rosenblueth's method, and the stability state of slopes can be evaluated bysynthesizing a group of moments. But in Dodagoudar's method, Rosenblueth's state function iscomposed of only two kinds of combinations of parameters rather than 2~n kinds of combinations. So amodified fuzzy point estimate method is proposed by the authors, and it is used in a slopereliability analysis.
A slope engineering system is a complex system, in which many uncertaintiesexist, including random uncertainties and fuzzy uncertainties. Traditionally, random uncertaintieswere often considered, while fuzzy uncertainties were ignored. Therefore, fuzzy-random methodsshould he proposed. A fuzzy point estimate method was proposed by Dodagoudar, that is, consideringthe effect of fuzzy-random factors, the fuzzy-random limit state function of slopes is changed torandom interval limit state function by the lambda level cutting, then the moments of the functioncan be obtained by the Rosenblueth's method, and the stability state of slopes can be evaluated bysynthesizing a group of moments. But in Dodagoudar's method, Rosenblueth's state function iscomposed of only two kinds of combinations of parameters rather than 2~n kinds of combinations. So amodified fuzzy point estimate method is proposed by the authors, and it is used in a slopereliability analysis.
基金
This work was financially supported by the "10.5"research project (No.2001BA609A-08).