期刊文献+

引进型300MW机组参与两班制运行的可行性 被引量:4

Feasibitlity of participation of imported 300 MW unit in two-shift operation
原文传递
导出
摘要 针对上海电网峰谷负荷差值大的特点,提出300MW机组短期停机和两班制调峰运行的方案。分析了近几年上海电网负荷平衡情况和300MW机组运行的可行性条件以及实施300MW机组两班制运行应进行的工作等内容。给出实施300MW机组两班制运行所带来的经济效益和社会效益。 Aiming at the enormous difference between the peak and the valley loads in Shanghai Electric Power System,a plan of short period of shutdown and two-shift cyclic operation of 300 MW unit was put forward.The situation of the power loads balance in recent years in Shanghai,the operation condition of 300 MW units and the work which should be done for two-shift operation of the 300 MWunit were analyzed respectively.The economic and social benefits which will be brought by two-shift operation of the 300 MW unit were expatiated.
出处 《华东电力》 北大核心 2004年第2期6-8,共3页 East China Electric Power
关键词 引进型 300MW机组 两班制运行 可行性 负荷平衡 汽轮发电机组 imported 300 MW unit two-shift operation peak and valley loads of the power grid load balance peak regulation method
  • 相关文献

同被引文献17

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部