摘要
利用AutoCAD中VBA语言进行二次开发,真正实现了在AutoCAD中建模,将数据导入到Ansys进行计算分析的方法。淮河临淮岗拦河大坝主坝工程的有限元前处理工作表明,该方法可以大大提高计算速度,具有较强的实用价值。
Based on the 2nd development of VBA language in AutoCAD, the models are set up in AutoCAD and data is led into Ansys for computation and analysis. The finite element pro-treatment work for the main dam project of the Huaihe River Lin-Huai-Gang Dam shows that the method is of practical value and the application of this method could raise computation speed greatly.
出处
《中国市政工程》
2004年第1期56-58,共3页
China Municipal Engineering