分析火力发电厂大型双曲线逆流式自然通风冷却塔钢筋混凝土风筒几种施工方法的特点,并对目前较多采用的三角架翻模加中心塔吊的施工方法如何进一步改进和完善进行探讨。
In this article, the author analyzes features of several construction methods of reinforcement concrete air tunnels of the large hyperbolic-type counter-flow natural ventilation cooling tower of a fuel electric plant, and discusses improvement methods for the normal construction method of tripod setting-up formwork and central tower crane.
出处
《施工技术》
CAS
北大核心
2004年第2期45-47,共3页
Construction Technology
关键词
冷却塔
双曲线形筒壁
三角架翻模
电动爬模
钢筋混凝土
cooling tower
hyperbolic-type tube wall
tripod setting-up formwork