郑州黄河二桥主桥为8×100m钢管混凝土简支系杆拱桥,位于黄河中游宽阔游荡性河段上。施工中采用了双线施工栈桥加跨墩龙门吊机的施工方案。着重介绍钢管拱的制造、安装方法以及施工中的控制重点。
The 2nd Zhengzhou Huanghe River Bridge proper is designed as 8×100 m simply-supported tied arch spans of concrete-filled steel tubes over the wide and braided reach in the midstream of Huanghe River. In the construction of the Bridge, the construction scheme of two-side construction trestles plus gantry cranes over piers are used. In this paper, the methods for fabrication and installation of the steel tube arches, and construction control points are described in particular.
出处
《桥梁建设》
EI
CSCD
北大核心
2004年第1期55-58,共4页
Bridge Construction
关键词
钢管混凝土结构
拱桥
桥梁施工
concrete-filled steel tube structure
arch bridge
bridge construction