摘要
文章介绍了中港三航局承建的泰国RAMA8斜拉桥主跨结构特点,主跨钢框架和砼面板的安装方案,以及桥面吊机的设计、制作、试验和实际使用情况。
The paper introduces the structural feature of the main span of Rama 8 Cable Stay Bridge in Thailand,which was undertaken and completed by CHEC-Shanghai Port Const.Corp.,and the methods for installation of the steel frames and concrete deck panels of the main span of the bridge.The design,fabrication,shakedown tests and commissioning of a derrick crane for the project are also presented in the paper.
出处
《中国港湾建设》
北大核心
2004年第1期48-50,共3页
China Harbour Engineering
关键词
斜拉桥
主垮安装
桥面吊机
cable stay bridge
main span installation
derrick crane