期刊文献+

垫脚加锚-高拱坝加固增稳的高效方法 被引量:2

Anchorage of abutment near by dam toe—effective reinforcement method for high arch dam
下载PDF
导出
摘要 本文首先介绍一种加固高拱坝的高效方法—垫脚加锚法 ,并阐述预应力锚索的锚固机理 ,然后对李家峡拱坝的垫脚加锚布置作了介绍。 An effective reinforcement method of abutment anchorage for high arch dam is introduced, and anchoring mechanism of pre stressed tendon is expounded. Then, the arrangement of abutment anchorage of Lijiaxia arch dam is presented. Both the geomechanical model test and nonlinear 3 D finite element analysis for Lijiaxia arch dam with or without abutment anchorage show that abutment anchorage has good reinforeement effect for high arch dam.
出处 《水力发电学报》 EI CSCD 北大核心 2004年第1期5-9,共5页 Journal of Hydroelectric Engineering
基金 国家 973项目 (2 0 0 2CB41 2 70 8) 中国博士后科学基金 (2 0 0 2 0 31 1 0 0 )
关键词 水工结构 垫脚加锚 模型试验 拱坝 预应力锚索 hydraulic structure ahchorage of abutment near by dam toe model test arch dam pre stressed tendon
  • 相关文献

参考文献5

二级参考文献11

共引文献62

同被引文献66

引证文献2

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部