应用复合土工膜加固石砭峪沥青混凝土斜墙坝 被引量:16

Reinforcement of Shibianyu asphalt concrete slope-wall rockfill dam with composite geomembrane
下载PDF
导出
摘要 介绍用复合土工膜加固石砭峪水库沥青混凝土斜墙坝的方案、技术路线和设计等.通过沥青混凝土斜墙现场取样和室内试验,得到石砭峪大坝沥青混凝土的强度,应用三维有限元法计算大坝在各运行水位作用下坝体各部位的应力应变,找出多年来大坝漏水的原因.决定采用充填灌浆和铺设复合土工膜相结合的处理措施,加固处理后的大坝经多次水位升降运行,性态正常,效果明显,渗流量仅40L/s. A detailed introduction is given to the scheme, technical line, and design for reinforcement of the Shibianyu asphalt concrete dam and its construction with the composite geomembrane. Through field sampling and laboratory tests, the strength of asphalt concrete of the Shibianyu dam is obtained, and the stress and strain in different parts of the dam under different operating water levels are calculated by use of the 3-D FEM.Furthermore,the causes of water leakage from the dam lasting many years are found out. According to the research, measures of full grouting and pavement of composite geomembrane are adopted for reinforcement of the dangerous dam. Many times’ operation of the dam with water-level rise and fall shows that the reinforced dam is in good operational condition, and that the volume of seepage is only 40 l/ s.
出处 《水利水电科技进展》 CSCD 2004年第1期10-14,共5页 Advances in Science and Technology of Water Resources
关键词 复合土工膜 斜墙堆石坝 有限元法 石砭峪水库 composite geomembrane slope-wall rockfill dam FEM shibianyu Reservoir
  • 相关文献

参考文献3

  • 1李新强.石砭峪水库大坝漏水分析与应急抢险工程措施[A]..中国科学技术文库[C].北京:技术文献出版社,1998..
  • 2屈华斌 孙晓范.复合土工膜在西安石砭峪水库除险加固工程中的应用[A]..土工合成材料防渗反滤和排水技术的研究与实践[C].武汉:武汉出版社,2001..
  • 3吴立新.沥青混凝土在荷载作用下的破坏特性探讨[J].土石坝工程,2001,(3):76-83.

共引文献1

同被引文献112

引证文献16

二级引证文献130

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部