基于PERT/CPM的关键链管理 被引量:105

Critical Chain Project Management Based on PERT/CPM
下载PDF
导出
摘要 网络规划技术是现代项目管理技术的重要组成部分。本文在对传统PERT/CPM网络规划方法分析的基础上,针对PERT三点估计在应用上的缺陷,引入TheoryofConstraint(TOC),并对PERT三点估计给出一种全新的解释。在新的解释下,TOC思想在项目规划中的运用被称为关键链管理(CCPM),强调在项目实施过程中加强对关键链的管理。为此,本文提出了一个基于三点估计的关键链管理的新方法,并通过实例论证关键链管理作为一种新的项目管理方法可以接近或者超过PERT/CPM的平均效果。 Network Scheduling Technology is one of the most important parts of Project Management(PM).Based on the analysis of PERT/CPM,the Theory of Constraint(TOC) is introduced and a completely-new explanation to three-point estimation is given,which overcomes the shortage of traditional three-point estimation in PERT.In this new explanation,the application of TOC in PM is intituled Critical Chain Project Management(CCPM),which emphasizes controlling Critical Chain in the execution of project.Further about how to control the Critical Chain,a new method based on three-point estimation will be drawn,and by an example,we will prove that this method is equal to or more effective than PERT/CPM.
作者 蔡晨 万伟
出处 《中国管理科学》 CSSCI 2003年第6期35-39,共5页 Chinese Journal of Management Science
基金 国家自然科学基金资助项目(79931000) 中科院科技政策与管理科学研究所所长基金(CJ0205)
关键词 THEORY of CONSTRAINT 关键链管理 PERT/CPM theory of constraint critical chain project management PERT/CPM
  • 相关文献

参考文献4

二级参考文献44

  • 1万伟,蔡晨.TOC及其在项目管理中的运用[J].中国管理科学,2002,10(z1):155-160. 被引量:6
  • 2华罗庚.华罗庚科普著作选集[M].上海:上海教育出版社,1984..
  • 3[1]Tracy Burton-Houle. The Theory of Constraints and its Thinking Process,A Brief Introduction to TOC[J].The Goldratt Institute, 2001,1-9.
  • 4[2]Zinovy D. Radovilsky. A quantitative approach to estimate the size of the time buffer in the theory to constraints[J]. International Journal of Production Economics 1998,55:113-119.
  • 5[3]Jose Luis Perez, BSIE,MSE.TOC For World Class Global Supply Management[J]. Computer industrial. Engineering, 1997,33(1-2):289-293.
  • 6[4]Herman Steyn. Project management applications of the theory of constraints beyond critical chain scheduling[J]. International Jourmal of Projects Management, 2002,20:75-80.
  • 7[5]Herman Steyn. An investigation into the fundamentals of critical chain projects scheduling[J]. International Journal of Project Management,2000,19:363-369.
  • 8[6]Chiu-Chi Wei, Ping-Hung Liu, Ying-Chin Tsai. Resource-constrained project management using enhanced theory of constraint[J].Intemational Journal of Project Management, 2002,20:561-567.
  • 9[7]Busby JS, Payne K. Issues of irganizational behavior in effort estimation for development projects[J]. International Journal of Project Man-agement, 1999,17(5):293-300.
  • 10[8]Robert Kee, Charles Schmidt. A comparative analysis of utilizing activity-based costing and the theory of constraints for making productmix decisions[J]. International journal of Production Economics,2000,63:1-17.

共引文献103

同被引文献711

引证文献105

二级引证文献402

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部