摘要
介绍了原铜洗系统对合成氨生产造成的不良影响 ,分别对铜洗塔、铜液过滤器、铜液再生系统热源、铜液再生器、铜液水冷器、吸氨塔等设备提出了改造方案 ,对改造后的生产运行效果。
The bad influence caused by original copper washing system on ammonia synthesis production was introduced, reformation scheme was presented respectively in allusion to copper washing tower, copper solution filter, heat source of copper solution regeneration system, copper solution regenerator, copper solution water cooler, and ammonia absorber etc., the production running effect, process parameters and economic benefit were summarized after executing the reformation.
出处
《化肥设计》
CAS
2004年第1期48-51,共4页
Chemical Fertilizer Design