期刊文献+

人工降雨缓解旱情及典型增雨过程分析 被引量:2

Analysis of Effect of Drought Mitigation and Typical Rainfall-Augment Process by Artificial Rainfall
下载PDF
导出
摘要 对山西省腹部盆地大气层中水汽含量的时空分布状况和开发利用空中水资源的实践经验及其经济效益进行了论证 ,选择 1998年 4月 2 7~ 2 8日山西省南部飞机增雨作业过程进行典型人工增雨作业过程效果评价 ,结论为作业后累积增雨率在第 480min时最大 ,为有效开展人工增雨作业提供了一定的依据。 In this paper, time and space distributions of water vapor in the middle basin of Shanxi Province, practical experience of water resources development in the air, and the economic benefits are demonstrated. The rainfall augment process by airplane during April 27-28, 1998 in the southern part of the province is selected to evaluate the effect of typical artificial rainfall augment process. The results show the accumulated rainfall augment rate reaches the maximum at 480 min, which provides basis for effective development of artificial rainfall augment process.
作者 高宗强
出处 《中国农村水利水电》 北大核心 2004年第3期30-31,共2页 China Rural Water and Hydropower
关键词 水资源 人工降雨 开发利用 增雨过程 water resources artificial rainfall development and use rainfall-augment process
  • 相关文献

参考文献1

  • 1南京大学地理系,中山大学地理系.普通水文学[M]人民教育出版社,1978.

同被引文献16

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部