摘要
介绍了三峡水利枢纽双线五级船闸人字闸门主要技术参数、技术特点和安装工艺 ,建立了闸门安装测量质量控制网点。
This paper introduced was main technology parameter,technology characteristic and installation process of the miter gate of double line 5 class navigation in the Three Gorges Project.Set up installation quality experience of other hydropower engineering.
出处
《水利电力机械》
2004年第1期11-15,共5页
Water Conservancy & Electric Power Machinery