摘要
结合某高炉工程概况 ,经分析探讨 ,确定了两部法施工的施工方案 ,并对其施工中的技术措施及施工方法作了介绍 。
Combined with blast furnace work based upon an al ysis the two-stage construction plan is determined. The technical measures and construction method are introduced as well as detailed quality control points.
出处
《山西建筑》
2004年第6期43-43,45,共2页
Shanxi Architecture