摘要
以太原市第四人民医院扩建工程为例 ,对超压缩工期条件下建筑工程质量的主要影响因素作了分析 ,总结了其彩钢房屋的质量控制要点 。
Taking the extension project in The Fourth Peo pl es Hospital of Taiyuan as example the major factors influencing engineering qual ity under the condition of super short construction time are analyzed; at the sa me time according to coated steel sheet construction corresponding quality contr ol measures are summarized in order to provide references for similar work in th e future.
出处
《山西建筑》
2004年第6期97-98,共2页
Shanxi Architecture