期刊文献+

深圳妈湾电厂码头结构设计

Terminal Structural Design for Shenzhen Mawan Power Plant
下载PDF
导出
摘要 深圳妈湾电厂码头工程包括2个5万吨级专用卸煤泊位,其码头使用荷载大:距码头前沿线33m起堆煤高度15m。码头结构采用对荷载适应性强的沉箱重力式。为减少码头前沿的反射波高,巧妙地在卸荷板和胸墙中设置进、出水孔和消浪室。并且对基槽开挖深度进行优化设计,取得了显著的经济效益。 The terminal for Shenzhen Mawan Power Plant includes two50,000dwt specialized coal-unloading berths and its heaped load is rather heavy:the coal stacking height is up to15m from33m behind the quay line and concrete caisson is adopted for adapting the heavy loads.Water inlet&outlet and wave breaking chambers are arranged for relieving slab and breast wall to reduce the reflected wave height alongside the berth.Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.
出处 《水运工程》 北大核心 2004年第3期85-88,共4页 Port & Waterway Engineering
关键词 重力式码头 消浪室 地基计算 gravity wharf wave breaking chamber foundation calculation
  • 相关文献

参考文献2

  • 1孙精石 李智贤 谷汉斌 罗家宁.深圳电厂重力式码头消浪水工模型试验报告[R].天津:交通部天津水运工程科学研究所,1990..
  • 2俞仲泉 龚崇准 顾家龙 卢廷浩 田平.深圳电厂码头地基稳定和沉降分析计算[M].南京:河海大学,1991..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部