摘要
介绍湛江港铁矿石码头改扩建工程试桩要求和试桩成果,对桩端完全开口型和加“一字型”隔板钢管桩的入土深度和垂直承载力进行对比、分析,并给出试桩成果的主要结论。
This paper introduces the requirements and results of test piling in the reconstruction and expansion project of Zhanjiang Port Iron Ore Terminal.Based on the comparison and analysis of the embedded depth and vertical bearing capacity of steel pipe pile of completely open end and open pile with line-shaped division plate,the main conclusion of test piling is given.
出处
《水运工程》
北大核心
2004年第3期97-100,共4页
Port & Waterway Engineering
关键词
码头
钢管桩
试桩
垂直承载力
terminal
steel pipe pile
test piling
vertical bearing capacity