采用静态挂片法及动态模拟实验研究了将城市污水处理厂二级出水直接回用作火电厂循环冷却水时 。
Through the static metal hanging slice test and dynamic simulation test,researchers on the copper corrosion factors of NH 4-N of the circulating cooling water system for which municipal wastewater is reused have been carried out.
出处
《贵州化工》
2004年第1期6-7,16,共3页
Guizhou Chemical Industry