介绍了哈三电厂3号机组(600MW)全程给水自动调节状况,分析了原设计存在的问题,提出了解决问题的办法和实现全程给水控制系统新的控制策略,提供了全程给水控制系统投入运行后的相关调整参数和运行曲线。
The whole processes feedwater automatic control system of 600 MW power generators of Harbin No.3 Power Generation Co.,Ltd is described,and the existing problems of the original design are analysed with possible solutions suggested.New control strategy is proposed for the whole processes feedwater automatic control system,and setting-up parameters and operating curves associated with the operation of the whole processes feedwater automatic control system are presented.
出处
《黑龙江电力》
CAS
2004年第1期45-47,54,共4页
Heilongjiang Electric Power
关键词
600MW机组
全程给水
自动调节系统
控制策略
600 MW power generators
whole processes feedwater
automatic control system