上海一钢750m^3高炉炉前脱硅试验研究

Test on De-silicon of the 750 m^3 Blast Furnace at Shanghai No.1 Iron & Steel Works
下载PDF
导出
摘要 在一钢 75 0m3高炉的鱼雷罐车和铁沟采用抛撒法投加脱硅剂进行脱硅试验 ,分析影响脱硅效率及铁水温降的各种因素。试验表明 ,在目前的生产条件下采用抛撒法工艺可有效地实施高炉铁水脱硅 ,且脱硅后铁水的硅含量和温度可满足炼钢进行脱磷预处理的要求。 Tests on de-silicon of the 750m 3 blast furnace at Shanghai No.1 Iron & Steel Works have been conducted through adding de-silicon agent into the torpedo ladle car and iron runner,a technology called soft feeding process.Factors influencing efficiency of de-silicon and causing temperature drop of hot metal have been analyzed.Test results show that the soft feeding process is effective in de-siliconizing BF iron under current conditions and the silicon content and temperature drop of the desiliconized hot metal can satisfy requirements of de-phosphorization pre-treatment in steel making process.
作者 黄春进
出处 《宝钢技术》 CAS 2004年第1期26-28,共3页 Baosteel Technology
关键词 高炉 脱硅 抛撒法 试验 Blast Furnace De-siliconization Soft feeding process Test
  • 相关文献

参考文献3

二级参考文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部