东荣三矿水采投产后 ,由于煤泥水处理系统存在一定缺陷 ,导致系统不能正常运行 ,为了不影响生产 ,在实际运转过程中 ,作了一些具体改进与完善 。
The normal operation of the slurry water treatment system has been affected since the comminssioning of the mine due to certain inherent defects of the system.For not interrupting the normal production,some specific measure were taken on site to improve and perfect the slurry water treatment system.The system after improvement can now cope with the production requirement of the mine
出处
《水力采煤与管道运输》
2004年第1期15-17,共3页
Hydraulic Coal Mining & Pipeline Transportation