摘要
结合鞍钢新 1号高炉改造工程 3号挡土墙局部滑移事故处理工程实际 ,提出并采用人工挖孔桩抗滑移加固处理方案 ,经实施证明 ,该方案简单、可靠 。
Combining the treatment of a sliding accident of No.3 retaining wall of No.1 blast furnace project for Angang Group, a strengthening method using man dug cast in place pile is introduced. It is proved that this scheme is convenient and reliable, which provides a reference for similar projects.
出处
《工业建筑》
CSCD
北大核心
2004年第2期88-90,共3页
Industrial Construction