期刊文献+

“模型黄河”工程的总体布局和建设任务 被引量:1

Overall Layout and Tasks of "Model Yellow River" Project
下载PDF
导出
摘要 "模型黄河"工程由各类实体模型工程、基础设施工程和测控系统工程等组成,基础设施工程和测控系统工程都是为各类实体模型服务的。根据"模型黄河"工程建设总体目标,确定的建设总体任务是:逐步建设功能齐全、模拟精度较高的黄土高原模型、水库模型、河道模型及河口模型体系,同时建成现代化程度高、技术先进、可起到"三条黄河"联动桥梁作用的自动化测控系统,以及扩展性强、布设合理的试验厅等相关基础设施。 The 'Model Yellow River' project is composed of various physical models, infrastructure works and testing and controlling system. The infrastructure works and testing and controlling system provide services for each type of physical model. According to the overall objective of the project, the decided overall tasks are as follows: To establish a system of Loess Plateau model, reservoir model, river channel model and estuary model with all functions and higher simulation precision. To establish an automatic testing and controlling system of high modernization, advanced technology and serving as a bridge of joint operation of 'three Yellow Rivers' and to establish related infrastructures, such as an expandable and reasonable layout testing hall.
作者 姚文艺
出处 《人民黄河》 CAS 北大核心 2004年第3期8-9,共2页 Yellow River
关键词 “模型黄河”工程 黄河 实体模型 河流模拟 基础设施工程 河口模型 physical model, river simulation, 'Model Yellow River' project, the Yellow River
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部