摘要
介绍了工程量清单报价的特点 ,并根据这些特点讲述了实施工程量清单报价以后的工程报价应根据企业定额并采用不平衡报价法等技巧进行 ,以提高中标的机率。工程中标后 ,应对工程成本费用要素 ,如人工费、材料费和机械费等进行严格管理 ,对工程施工过程中发生的设计变更或其他与合同和工程量清单不一致的地方进行记录并签证 ,为以后的索赔作准备。同时 ,还强调了应进行合理的索赔。
This text introduced characteristic of the quoted price of the bill of quantities, according to these characteristics,we quote price using the front loaded method and basing on enterprise ration during the quoted price of the bill of quantities puts in practice the to increase the winning probability.Afte gaining the project, the main factor of the cost &expense, such as laborage, material fee, machine fee , and so on, should to be strictly managed ,the changed design or the item different to the contract & the bill of quantities should be record and visad for claiming for compensation later. At the same time, this test emphasized that we should claim for compensation in reason.
出处
《西部探矿工程》
CAS
2004年第4期199-201,共3页
West-China Exploration Engineering
关键词
工程量清单
企业定额
不平衡方法
施工管理
合理索赔
bill of quantities
enterprise ration
the front loaded method
construction management
claim for compensation in reason