期刊文献+

采矿工业两级供应链中的协调生产计划建模 被引量:8

Modeling of the Coordinated Production Planning of a Two-Stage Mineral Industry Supply Chain
下载PDF
导出
摘要 对由一个矿山和一个选矿厂构成的采矿工业两级供应链中的协调生产计划问题进行了研究,建立了相应的线性规划模型·模型的特点是:①集成采选两个环节的生产计划;②将运输问题集成到生产计划中·模型的目标追求供应链总成本最小·模型适用于由一个矿山和一个选厂所组成的两级供应链或者采选联合企业,且能够较容易地扩展到多个矿山和多个选厂的供应链结构·给出了算例以说明模型的应用·结果表明:能够为矿山和选矿厂的协调生产提供决策支持,能够节省总的生产和运输成本,有潜在的应用价值· The coordinated production planning of a two-stage mineral industry supply chain is studied, in which one open pit mine and one concentrating mill are involved. A linear programming model is then formulated, which covers two characteristics: ①integrating the production planning of two stages, i.e. the mine and concentrating mill; ②integrating transportation planning and production planning. The model's objective is to minimize the total cost of the supply chain, and it is very applicable but unlimited to the two-stage mineral industry supply chain or the integrated mining-concentrating enterprise with one mine and one mill. It can easily be extended to the supply chain with multiple mines and mills. An application example is given to illustrate the model. The solution shows that the model can offer decision support for the coordinated production of two stages, reduce the total cost of both production and transportation and has a potential of application.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2004年第4期352-355,共4页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金资助项目(70171030 60274049) 霍英东青年教师基金资助项目(81073).
关键词 两级供应链 协调生产计划 线性规划 采矿工业 two-stage supply chain coordinated production planning linear programming mineral industry
  • 相关文献

参考文献9

  • 1[1]Croom S, Romano P, Giannakis M. Supply chain management: an analytical framework for critical literature review[J]. European Journal of Purchasing & Supply Management, 2000,6:67-83.
  • 2[2]Blanco-Freja E E. Coordinated production and distribution scheduling in supply chain management[D]. Atlanta: Georgia Institute of Technology, 2000.3-9.
  • 3[3]Shin H. Inventory coordination in the industrial supply chain[D]. Columbus: The Ohio State University, 2001.4-9.
  • 4[4]Sauter H, Nawrath F. Integrated production planning as core competence of a supply chain[J]. Stahl und Eisen, 2000,120(12):103-106.
  • 5[5]Winterhalder L, Kleinschmidt R. Operative production planning and control as a precondition for supply chain management[J]. Stahl und Eisen, 2000,120(3):57-60.
  • 6[7]Caccetta L, Hill S P. An application of branch and cut to open pit mine scheduling[J]. Journal of Global Optimization, 2003,27:349-365.
  • 7[8]Sundar D K, Acharya D. Blast schedule planning and shiftwise production scheduling of an opencast iron ore mine[J]. Computers and Industry Engineering, 1995,28(4):927-935.
  • 8[9]Tolwinski B, Underwood R. A scheduling algorithm for open pit mines[J]. IMA Journal of Mathematics Applied in Business and Industry, 1996,7:247-270.
  • 9[10]Pendharkar P C. A fuzzy linear programming model for production planning in coal mines[J]. Computers Ops Res, 1997,24(12):1141-1149.

同被引文献96

引证文献8

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部