摘要 随着市场的发展和投资效益的提高 ,电厂为在投资总额不增加的条件下 ,取得更大的效益 ,将机组出力由原来的 12 5MW机组增容为 135MW机组。为满足市场的这一需求 ,增强市场竞争能力 ,使除氧器更能适应机组的发展要求 ,除氧器的设计针对以往传统设计中一些不完善 ,不经济的地方 ,结合了国内外一些先进的技术资料 。 Capacity of the power unit has been increased from 125MW to 135MM without any additional investment along with the development of the market and the increment of investment returns. The design of deaerator has been optimized based on the advanced technical information both at home and abroad and against some inperfect and uneconomic parts of traditional deaerator design in order to meet the needs of the above-mentioned requirements and to strengthen company's competitive power and also make the deaerator fit in with the developing requirement of power wnit.
出处 《电站辅机》 2004年第1期1-5,22,共6页 Power Station Auxiliary Equipment
关键词 135MW机组 锅炉 除氧器 水箱 优化设计 135MW power unit deaerator water tank improvement optimized design
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部