期刊文献+

连续梁桥中跨合拢方案设计 被引量:14

A Design of Joining the Middle Span of Continuous Pre-stressed Bridges
下载PDF
导出
摘要 连续梁桥合拢段施工时 ,温度应力常常是预应力混凝土梁桥产生裂缝的主要原因。如何在温度变化时保证合拢段混凝土的质量 ,是合拢段施工成功与否的关键。结合具体实例 ,运用有限元理论对连续梁桥中跨合拢施工进行模拟分析 ,提出了确定中跨合拢方案的基本原理、计算方法以及所应采取的施工措施 。 In joining the middle span of continuous pre-stressed beam bridge, the temperature stress is the main reason that produces cracks. The quality guarantee of the concrete is crucial to the success of the joining under temperature changes. A concrete example of bridge joining and the method of finite element theory are adopted in this paper to put forward a calculating method and some construction measures that can serve as references for the engineering undertakings of similar bridges.
出处 《淮海工学院学报(自然科学版)》 CAS 2004年第1期66-69,共4页 Journal of Huaihai Institute of Technology:Natural Sciences Edition
关键词 连续梁桥 跨合拢方案 方案设计 合拢温度 有限元 continuous beam bridge joining of the middle span joining temperature finite element
  • 相关文献

参考文献5

共引文献17

同被引文献40

引证文献14

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部