摘要
着重介绍了老路加铺的方案及新老搭接的处理 ,重点对老路的弯沉控制指标、修补措施、加铺方案和新老路基路面的搭接处理做了详细的分析。
The overlaying methods of deteriorated road and overlapping measures between deteriorated and new road are introduced in this paper.The deflection control indexes of deteriorated road,remedy methods,overlay methods and overlapping measures between deteriorated and new road are also presented.
出处
《森林工程》
北大核心
2004年第2期37-39,共3页
Forest Engineering