摘要
针对聊城电厂2×600MW机组冷却塔池壁的施工,详细地介绍了该厂冷却塔施工池壁过程中为防止出现裂缝采取的措施及计算。
This article is about the detailed measures and calculations adapted during the construction of the cooling tower wall in 2* 600MW Liaocheng Power station, in order to avoid the appearance of cracks.
出处
《山东电力技术》
2004年第2期72-74,共3页
Shandong Electric Power