60孔焦炉提前投产的实践

Advanced Onset Practice of the 60-hole Coke Oven
下载PDF
导出
摘要 介绍柳钢在备煤、焦炉、化产及公辅等系统不配套条件下,通过利用原有80型焦炉配套系统部分工序能力余量并加以扩容改造,实现新60孔焦炉提前投产出焦的方案及其实施。 Liugang put coke oven of 600,000t into production beforehand by utilizing the some process capability allowances of the fitting system of the original 80-type coke oven and the technical modernization with capacity expansion under the condition of the inadequate coal preparation system, coke oven system, chemical product recovery system and the auxiliary system. The schemes and the implement of that have been introduced.
出处 《柳钢科技》 2004年第1期1-4,共4页
关键词 炼焦 焦炉 投产 备煤 扩容改造 Cokemaking Coke Oven Advancde Onset