创建引子渡特色的水电建设管理新平台

Foundation of a new hydropower project management characterized by Yinzidu
下载PDF
导出
摘要 本文着重介绍了引子渡工程建设管理经验。这些经验包括积极推进项目法人责任制、建设监理制、招投标制和合同管理制;强化工期和目标管理;依靠科技进步,发挥设计的龙头作用,提倡专家咨询,科学决策;辩证处理好工期、质量、造价之间的关系;强化安全管理,强化现场协调管理等。 This article mainly introduces the management experience of constructing Yinzidu project.Those includes positive ad-vancing the institution of legal person responsibility,supervision system,bidding system and contract management regulation.Strengthening construction time and objective management,making the most of designing work relying on science and technology development,advocating expert's consulting and scientific decision,dialectically dealing with the relationship between quality and cost,strengthening safety management and field coordination are also the experience from Yinzidu hydropower practice.
作者 李洪泉
出处 《大坝与安全》 2004年第2期1-3,共3页 Dam & Safety
关键词 引子渡水电站 水电建设 招投标 工程监理 合同管理 工期 Yinzidu hydropower station,hydropower project management,project bidding,project supervision,investment,construction stage
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部