摘要
本文介绍了在设计中通过坝型选择,枢纽布置调整,不断进行设计优化,为降低工程投资、缩短建设工期、高质量快速建成该电站所做的工作。
Yinzidu hydropower station is one of the first group of west-electricity-transmitted-to-the-east projects.In designing,we have continuously optimized design by selecting dam type and regulating hydraulic layout and so on,which made a great contri-bution to project construction in high quality,lower investment and short construction stage.
出处
《大坝与安全》
2004年第2期11-15,共5页
Dam & Safety