摘要
引子渡水电站为引水式地面厂房,厂区布置紧凑,无施工干扰。由于施工工期紧,设计上采用轻型屋面网架结构、钢结构吊车梁等优化设计,施工采用滑模施工技术代替传统混凝土浇筑方法,对缩短工期起到了有效作用,解决了目前在建工程工期短的一些问题。
Yinzidu hydropower station has diversion-type ground powerhouse with the characteristics of compact layout and not disturbed by construction.Light roof netting frame structure is designed to be used,optimizing the design of steel structure crane beam and sliding frame technology are adopted in construction instead traditional concrete placement.Those measures have much effect on cutting construction time.
出处
《大坝与安全》
2004年第2期20-22,共3页
Dam & Safety