摘要
综合考虑枢纽布置,通过理论设计与试验研究结合,调整溢洪道布置,使其满足施工及运行要求。
To comprehensive consider the layout of the whole hydraulic structure,design of spillway layout is adjusted to meet the requirement of construction and operation through theory design and experimental study.
出处
《大坝与安全》
2004年第2期23-25,共3页
Dam & Safety
关键词
引子渡水电站
溢洪道
坝址
洪峰流量
水工模型试验
Yinzidu hydropower station,spillway,design layout,experiment and study,optimizing and adjusting