摘要
根据引子渡水电站的工程规模和特点,结合主要的设计计算研究大型钢岔管的布置设计,使其结构布置安全、合理、经济,满足运行要求。
Based on the features and project scale of Yinzidu hydropower project,large steel bifurcated pipe layout,which made it safe,rational and economic was studied in combination with primary design calculation.Therefore it could meet the operation re-quirement.
出处
《大坝与安全》
2004年第2期26-30,共5页
Dam & Safety
关键词
引子渡水电站
压力钢管
钢岔管
体型设计
围岩
调压井
Yinzidu hydropower station,type design,penstock and large bifurcated steel pipe