摘要
引子渡水电站拦河坝,从开始填筑到下闸蓄水总历时15个月,最高月填筑强度达40.3万m3。在复杂的施工条件严格的质量控制和紧张的工期要求下,创造了质量与进度的双赢。
It costs15months overall from initial dam filling to impounding in Yinzidu project,the most filling intensity every month is up to40.3m 3 .Under those restricted requirement of complicated construction condition,strict quality control and limiting con-struction time,the contractor have made an effort to create harmony of quality and progress.
出处
《大坝与安全》
2004年第2期41-43,共3页
Dam & Safety
关键词
引子渡水电站
面板堆石坝
填筑
蓄水
质量控制
Yinzidu hydropower station,face rockfill dam,construction,quality,schedule control