公路施工项目进度与成本集成化的矩阵描述

One kinds of matrix describling to integrate progress plan and cost for highway projects
下载PDF
导出
摘要 笔者针对公路施工项目进度-成本界面之间的冲突,探讨两界面的数据集成化方法.运用矩阵描述项目工作分解结构(WBS)和成本分解结构(CBS),并用矩阵方程将进度-成本关系联系起来.为发展该算法,介绍了问题求解思路和实例,并对进度方案经济作了评价. The text research to the integration of progress plan and cost data sets for highway projects, which bases the conflicts between them. Matrices are introduced to describle work breakdown structure and cost breakdown structure,and time-cost related matirix equations are presented to solve the interrelationships between their suface. We introduction the method and example to solve the problem in order to develop a project planning and cost control algorithm,and evaluates the scheduling economy using the matrix equations derived here.
作者 何寿奎
出处 《重庆交通学院学报》 2004年第3期80-82,共3页 Journal of Chongqing Jiaotong University
关键词 进度方案 成本 集成化 分解结构 矩阵描述 project planning cost integration breakdown structure matrix describling.
  • 相关文献

参考文献2

  • 1杨子敏.公路工程造价指南[M].北京:人民交通出版社,2000..
  • 2J.D.弗雷姆[美]著 郭宝柱译.新项目管理[M].北京:世界图书出版公司,2001..

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部