摘要
预制混凝土箱梁预应力拼装工艺在沪闵高架二期工程得到应用后,体内预应力索可能产生锈蚀及如何监测已成为不可忽视的问题。该文结合沪闵高架二期工程的结构和施工工艺特点,介绍了CMS锈蚀监测系统的应用,可供实施管理单位借鉴和参考。
After the application of segmental prestressed process for precast concrete box girder in the 2nd phase of Humin Viaduct Works, the probable rusting in body prestressing cables and how to supervise it have become problems not to be neglected. Based on the characteristics of structure and construction process of the 2nd phase of Humin Viaduct Works, introduced here is the application of CMS rust supervision system for the reference of construction and management enterprises.
出处
《中国市政工程》
2004年第2期46-47,共2页
China Municipal Engineering