摘要
叙述了广东省梅县丙村水电站模袋砼护坡施工工艺及方法,对施工遇到的问题进行了总结.
The construction techniques and mechods with concrete model bag in Bing chueng Power station of Mei County in Guangdong are elabrated, and some problems encountered in construction are summarized too.
出处
《南昌水专学报》
2004年第1期19-21,共3页
Journal of Nanchang College of Water Conservancy and Hydroelectric Power