摘要
对水电分厂供电车间重要配电所在Ⅰ段母线清扫时 ,Ⅲ段母线作为Ⅱ段备用的局限作了分析 ,介绍了改进方案以及在实践中的具体应用 ,提出了几点建议。
According to the issues encountered in bus checking in power supply workshop of hydroelectric plant that III section bus cannot be used as emergency bus of II section in this paper corresponding improvement plan is proposed. Meanwhile, several suggestions are summarized based upon practice.
出处
《山西建筑》
2004年第9期64-64,共1页
Shanxi Architecture