摘要
以乌鞘岭特长隧道 6号斜井为例 ,分析了特长隧道机械配套的主要原则和因素 ,并对机械设备的需用量进行了计算 ,提出了机械设备配套技术及其管理和应用技术。
Taking the 6# incline shaft work in Wuqiaoliang Tunnel as example the mating principles of construction machinery for super-long tunnel are analyzed as well as influencing factors. Meanwhile, the demand for mechanical equipments is calculated. The management and application technology of mating technique of construction mechanism is introduced.
出处
《山西建筑》
2004年第9期106-107,共2页
Shanxi Architecture