摘要
根据活动模型在C3I系统中应用的广泛性、仿真模型生成的困难性,以及二者之间的相似性,提出一种间接生成Petri网仿真模型的方法,即首先建立活动模型,然后在此基础上生成可执行Petri网模型,从而简化仿真模型的建立过程。还简要介绍二者之间的转换规则,并给出应用实例。
According to the broad use of activity models in C^3I system,the difficulty of generating the simulation models,and the similarly of the two kinds of models,we try to describe an approach to generating the simulation models indirectly,i.e,build activity models first,then translate them into executable Petri nets models automatically.We use the executable models to simulate C^3I systems.We also describe the generation rules and give an example in this paper.
出处
《火力与指挥控制》
CSCD
北大核心
2004年第2期10-13,共4页
Fire Control & Command Control