摘要
针对陇海线郑州至宝鸡段电码化实施方案进行了详细的分析,对二线制和四线制电码化的优缺点进行了全面比较。
Detailed analysis of the coding implementation scheme of Zhengzhou to Baoji section of Longhai Line, and the overall comparison of the advantages and disadvantages of two-wire coding and four-wire coding is given in this article
出处
《铁路通信信号工程技术》
2004年第1期13-15,共3页
Railway Signalling & Communication Engineering