摘要
通过对煤矿竖井高程联系测量分析 ,提出采用全站仪进行联系测量的新方法 ,同时对测量过程、方法进行分析和探讨。
Based on analysing the problems occurred during shaft's elevation survey using traditional methods,the new approach of survey by means of total-station meter is introduced.Concrete procedures and ways of the new approach are discussed.
出处
《矿业工程》
CAS
2004年第2期45-47,共3页
Mining Engineering
关键词
全站仪
竖井测量
高程联系测量
测量过程
shaft
elevation survey
total-station meter
influencing factors