摘要
简要介绍三峡左岸电站VGS机组结构特点,总装特点,盘车及轴线调整的程序、计算方法,程序修改情况及对工期的影响等。
The paper introduces the structure and assembly characteristics of VGS generating sets for Three Gorges
Left Powerhouse. The axis alignment process, calculation methods and the influence of working procedure revision on
the time lime for the project are stated briefly.
出处
《水电站机电技术》
2004年第2期1-4,共4页
Mechanical & Electrical Technique of Hydropower Station
关键词
三峡左岸电站
VGS水轮发电机组
轴线
盘车
总装
Three Gorges Left Powerhouse
VGS generating set
assembly
axis alignment