期刊文献+

郑东新区高层建筑基础选型案例研究 被引量:2

Study on foundation selective cases of tall building in ZhengDong New Zone
下载PDF
导出
摘要  结合郑州市郑东新区某工程实例,在满足力学计算和现行规范的前提下,对基础方案进行比较,确定采用600灌注桩是一个经济、可靠的地基处理方案,对今后该地区类似工程基础方案的确定,起一定的参考作用。 In this paper, on the premise of sufficing for the calculation of mechanics and the current criterion, it is combined with an example of civil engineering by comparing different base projects, which is in ZhengDong New Zone, site-cased RC pile diameter 600 to confirm an economic and credible project that deals with the groundsite. To the analogous civil engineering of this area, it has some referenced effect on the confirmation of base scheme in the future.
作者 杨乐 李国强
出处 《平顶山工学院学报》 CAS 2004年第1期45-47,共3页 Journal of Pingdingshan Institute of Technology
关键词 高层建筑 基础选型 CFG桩复合地基 桩基 disposal of groundsite base scheme comparison of economy CFG stake compound base
  • 相关文献

参考文献2

  • 1GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 2JGJ79-2002.建筑地基处理技术规范[S].[S].中国建筑科学研究院,..

共引文献1839

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部