从天然地基处理、路基填筑以及填筑完后的强化措施等几个方面 ,综合考虑快速施工的高填方路基作为大型桥梁预制场的特殊情况 ,使其能满足预制构件的施工、堆放、运输及吊装要求。
This paper illuminates the high embankment of fast construction as the bridge prefabrication site from three aspects of processing natural subgrade,filling embankment and strengthen measures,and make it prepare for the construction,piling up,transport and assembly of prefabricated components.