期刊文献+

狮子滩水库防洪调度控制指标的复核分析 被引量:6

Analysis of Flood Control and Regulation Indices Checking for Shizitan Reservoir
下载PDF
导出
摘要 在通过 GPS技术对狮子滩水库水下地形进行测量的基础上 ,给出了新的水位~库容关系曲线。并利用所建立的水库运行调度模型 ,研究了该水库淤积变化对其防洪控制的影响。结果表明 :195 6~ 2 0 0 2年 ,虽然狮子滩水库淤积了 4 6 5 6 m3,但主要是淤积在多年平均库水位 340 .0 m以下 ,对其在汛限水位 346 .5 m以上的防洪调度影响不大。并且 ,在现有防洪调度方案和水位~库容关系情况下 ,水库能满足其防洪对象的防洪安全要求。 Based on the under water topographic survey of Shizitan Reservoir by GPS technique, a new reservoir water level - capacity curve is drawn;and the effect of sediment accumulation on flood control is researched by using the reservoir operation and regulation model established. The results show that although the reservoir accumulated 4 656 m 3 of sediment in 1956~2002, the flood regulation was not affected because most sediment accumulation happened under 340 m, the average water level, much lower than 346.5 m, the flood control level;the reservoir can meet the safety demand of the flood-protected area with the flood control and regulation scheme and water level - capacity relationship.
出处 《中国农村水利水电》 北大核心 2004年第4期30-32,共3页 China Rural Water and Hydropower
关键词 狮子滩水库 防洪调度 GPS 水库淤积 防洪安全 reservoir GIS technique flood regulation reservoir sediment accumulation
  • 相关文献

参考文献3

共引文献4

同被引文献34

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部